BuildCalc

Concrete for a 10×10 ft driveway

A 10 × 10 ft driveway at 6 in deep needs 1.85 cubic yards of concrete — about 84 × 80 lb bags, roughly 3.75 tons and $305.56 of material. Fine-tune below.

Concrete needed
1.94 cubic yards
52.5 ft³ · 1.49 m³, including 5% waste
Estimated weight
3.94 tons
7,875 lb at 150 lb per cubic foot
Estimated cost
$320.83
At $165.00 per cubic yard, material only

Full breakdown

ItemValue
Volume before waste50.0 ft³
Volume with 5% waste52.5 ft³
Cubic yards1.94
Cubic metres1.49
Cubic feet52.5
Weight3.94 tons (7,875 lb)
Full dump-truck loads1 × 10 yd³ truck
80 lb bags88 bags · $602.80
60 lb bags117 bags · $637.65
Sq ft covered at 1 in deep630
Sq ft covered at 3 in deep210
  • Formula: length × width × depth, with depth converted from inches to feet (÷ 12), then × (1 + waste%).
  • Concrete: Concrete is ordered by the cubic yard from a ready-mix plant, or mixed from 60 lb and 80 lb bags for small pours.
  • Ready-mix plants almost always have a minimum charge — often 1 cubic yard — plus a short-load fee below about 3 yards, so a 0.5-yard pour can cost nearly as much as a 3-yard one.
  • Prices are national averages for planning, not quotes. Confirm with a local supplier — delivery, short-load fees and tax are extra.

Working out 100 square feet at a 6 in depth gives 50.0 ft³ — 1.85 cubic yards of concrete, weighing roughly 3.75 tons.

The calculator above is pre-filled with these dimensions — change any field to see the numbers update. Concrete is ordered by the cubic yard from a ready-mix plant, or mixed from 60 lb and 80 lb bags for small pours.

Frequently asked questions

How many cubic yards of concrete for a 10×10 ft driveway?

About 1.85 cubic yards at 6 in deep, which is 50.0 cubic feet or 3.75 tons. Add 5% waste if the ground is uneven.

How many bags is that?

84 × 80 lb bags, or 112 × 60 lb bags. Bagged is only worth it at this size if you cannot take a truck delivery.

What depth should a driveway be?

6 in is the standard for concrete in this application. Ready-mix plants almost always have a minimum charge — often 1 cubic yard — plus a short-load fee below about 3 yards, so a 0.5-yard pour can cost nearly as much as a 3-yard one.