A 10 × 10 ft slab at 4 in deep needs 1.23 cubic yards of concrete — about 56 × 80 lb bags, roughly 2.50 tons and $203.70 of material. Fine-tune below.

Concrete needed
1.30 cubic yards
35.0 ft³ · 0.99 m³, including 5% waste
Estimated weight
2.63 tons
5,250 lb at 150 lb per cubic foot
Estimated cost
$213.89
At $165.00 per cubic yard, material only

Full breakdown

ItemValue
Volume before waste33.3 ft³
Volume with 5% waste35.0 ft³
Cubic yards1.30
Cubic metres0.99
Cubic feet35.0
Weight2.63 tons (5,250 lb)
Full dump-truck loads1 × 10 yd³ truck
80 lb bags59 bags · $404.15
60 lb bags78 bags · $425.10
Sq ft covered at 1 in deep420
Sq ft covered at 3 in deep140
  • Formula: length × width × depth, with depth converted from inches to feet (÷ 12), then × (1 + waste%).
  • Concrete: Concrete is ordered by the cubic yard from a ready-mix plant, or mixed from 60 lb and 80 lb bags for small pours.
  • Ready-mix plants almost always have a minimum charge — often 1 cubic yard — plus a short-load fee below about 3 yards, so a 0.5-yard pour can cost nearly as much as a 3-yard one.
  • Prices are national averages for planning, not quotes. Confirm with a local supplier — delivery, short-load fees and tax are extra.

10 × 10 ft is 100 square feet. Spread 4 in deep, that is 33.3 cubic feet, or 1.23 cubic yards, of concrete. Expect to order around 2.50 tons.

The calculator above is pre-filled with these dimensions — change any field to see the numbers update. Concrete is ordered by the cubic yard from a ready-mix plant, or mixed from 60 lb and 80 lb bags for small pours.

Frequently asked questions

How many cubic yards of concrete for a 10×10 ft slab?

About 1.23 cubic yards at 4 in deep, which is 33.3 cubic feet or 2.50 tons. Add 5% waste if the ground is uneven.

How many bags is that?

56 × 80 lb bags, or 75 × 60 lb bags. Bagged is only worth it at this size if you cannot take a truck delivery.

What depth should a slab be?

4 in is the standard for concrete in this application. Ready-mix plants almost always have a minimum charge — often 1 cubic yard — plus a short-load fee below about 3 yards, so a 0.5-yard pour can cost nearly as much as a 3-yard one.