BuildCalc

Concrete for a 12×12 ft driveway

A 12 × 12 ft driveway at 6 in deep needs 2.67 cubic yards of concrete — about 120 × 80 lb bags, roughly 5.40 tons and $440.00 of material. Fine-tune below.

Concrete needed
2.80 cubic yards
75.6 ft³ · 2.14 m³, including 5% waste
Estimated weight
5.67 tons
11,340 lb at 150 lb per cubic foot
Estimated cost
$462.00
At $165.00 per cubic yard, material only

Full breakdown

ItemValue
Volume before waste72.0 ft³
Volume with 5% waste75.6 ft³
Cubic yards2.80
Cubic metres2.14
Cubic feet75.6
Weight5.67 tons (11,340 lb)
Full dump-truck loads1 × 10 yd³ truck
80 lb bags127 bags · $869.95
60 lb bags169 bags · $921.05
Sq ft covered at 1 in deep907
Sq ft covered at 3 in deep302
  • Formula: length × width × depth, with depth converted from inches to feet (÷ 12), then × (1 + waste%).
  • Concrete: Concrete is ordered by the cubic yard from a ready-mix plant, or mixed from 60 lb and 80 lb bags for small pours.
  • Ready-mix plants almost always have a minimum charge — often 1 cubic yard — plus a short-load fee below about 3 yards, so a 0.5-yard pour can cost nearly as much as a 3-yard one.
  • Prices are national averages for planning, not quotes. Confirm with a local supplier — delivery, short-load fees and tax are extra.

Working out 144 square feet at a 6 in depth gives 72.0 ft³ — 2.67 cubic yards of concrete, weighing roughly 5.40 tons.

The calculator above is pre-filled with these dimensions — change any field to see the numbers update. Concrete is ordered by the cubic yard from a ready-mix plant, or mixed from 60 lb and 80 lb bags for small pours.

Frequently asked questions

How many cubic yards of concrete for a 12×12 ft driveway?

About 2.67 cubic yards at 6 in deep, which is 72.0 cubic feet or 5.40 tons. Add 5% waste if the ground is uneven.

How many bags is that?

120 × 80 lb bags, or 160 × 60 lb bags. Bagged is only worth it at this size if you cannot take a truck delivery.

What depth should a driveway be?

6 in is the standard for concrete in this application. Ready-mix plants almost always have a minimum charge — often 1 cubic yard — plus a short-load fee below about 3 yards, so a 0.5-yard pour can cost nearly as much as a 3-yard one.

Related